For suitable sites, a project may be structured without an upfront capital contribution from the infrastructure owner.
Key considerations
- Subject to full technical and commercial feasibility
- Project company funds and operates the asset
- Commercial consideration is defined contractually
Infrastructure focused assessment
The starting point is the operational asset: its purpose, route, interfaces, access requirements and lifecycle obligations. Photovoltaic generation is then evaluated within those constraints.
Feasibility and delivery
No commercial structure should be assumed before technical, planning, grid and economic feasibility is established. Where conditions support development, responsibilities and consideration are documented through detailed agreements.
Next step
A useful first discussion includes route length, asset status, location, grid context and the organisation's operational requirements.